After the cut out we use:

***C-Shape galvanized metal to frame out the door and the doorframe. We use two different sizes, the actual door is welded to a C-Shape galvanized metal and the frame has 3½ C-Shape galvanized metal welded to it.
Then we apply an expansive foam inside both container door frames.
We weld our door hinges to the door and it’s frame.

We also use some extra hinges in all our doors, usually 3-4 on a standard size door.

Once the hinges are on then we begin with the lock. This has taken us 2-4 hours sometimes. I don’t really know why but it’s just seems like it’s a more delicate weld. We basically line up the lock and then clamp it on and being the welding.